Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 11/13/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 10/08/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
checked the west side of the patch with a 10ft straight edge and it was good - CN |
| 10/05/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
installing water collars today on valencia in the fresh paving from yesterday - CN |
| 10/04/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
working on milling the roadway - will be paving later today - CN |
| 10/04/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
had area paved by the time i made it back to the site around 1pm - CN |
| 10/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with tucson asphalt about the mill and repave for tomorrow - CN |
| 09/06/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
stopped by and talked with eddie to let him know what mix to use ad base pag #1 and for the 2inch mill to be tdot 2 - he said that dave was hiring a sub for the milling and i told eddie to have the sub or dave call me to make sure it was done right - CN |
| 09/05/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
tricon started water install and was reminded about moritorium in asphalt - got with matt and pete about what asphalt to use on this job which was pag 1 for bottom lift and tdot-2 for the 2inch milled top |
| 09/04/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
tricon on site today and going to be saw cutting the road way - CN |