Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-Routine Barricade Inspect
| Date |
Description |
Inspector |
Results |
Comments |
| 11/21/2018 |
TDOT-Routine Barricade Inspect |
|
Approved |
pete and i went and looked at it - pete said to leave it due to current road conditions - close permit |
| 11/13/2018 |
TDOT-Routine Barricade Inspect |
|
Continued |
patch work was redone and it was still high - will have pete come out and see what he thinks - CN |
| 11/09/2018 |
TDOT-Routine Barricade Inspect |
|
Continued |
meet with ken with alpha underground who will get the patch fixed today - i will check the work on tuesday - CN |
| 10/31/2018 |
TDOT-Routine Barricade Inspect |
|
Continued |
called carol with cox who has me talk to the designer - he said that he would call alpha to have them fix it - CN |
| 09/25/2018 |
TDOT-Routine Barricade Inspect |
|
Continued |
area of patch work out of the 1/4 inch spec tolerance - called carol from cox and let her know that the ac was out of spec - CN |
| 08/21/2018 |
TDOT-Routine Barricade Inspect |
|
Continued |
blue stake done - no other work - CN |