Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | WORK HAS BEEN COMPLETED NO ISSUES AT THIS TIME |
|
| 09/14/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | PERMIT HAS EXPIRED TEMP PATCH IN PLACE |
|
| 08/29/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | TEMP PATCH | |
| 08/15/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCH NO CONTRACTOR ON SITE | |
| 08/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCH | |
| 08/06/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | TEMP PATCH |