Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/05/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | work completed - close permit | |
| 09/21/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went out to the job site - watched them saw cut asphalt and prep SG for paving - CN | |
| 09/21/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went back out watched them place the 2nd lift of asphalt - CN | |
| 09/20/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went out and checked on the plates on alvernon due to a complaint call about a dangerous issue - got to the site the plates had shifted a little bit but are only there till they are able to pave - informed matt eagle rock wasnt onsite to be able to fix anything - CN | |
| 09/11/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went back out due to a complaint of a trench failing in the area - the work area was still plated - had contractor adjust the plates in the roadway as they had sunk a little bit - I went back later in the day and drove the job - the plates were adjusted pretty well and there was only a little bump - they also had a bump sign up - CN | |
| 09/04/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | still had plates on alvernon - told the forman to dress up the plate areas to make the ride a little better - CN | |
| 07/31/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | had a main exposed and planned on pouring the base later today - CN i watched santa rita from another job back into a no parking sign. both the forman and a laborer from eagle rock saw him back into the sign also. |
|
| 07/26/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | started saw cutting the roadway - had traffic control up per plan - CN | |
| 07/19/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | precon - contractor will contact me with start date - CN |