Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 09/28/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 08/28/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
TEP onsite mandreling the lines that have been installed - sidewalk still needs to be replaced - CN |
| 08/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with city irrigation guy who needed diversified to fix some stuff that they damaged during work in the area -CN |
| 07/23/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pre - con talked about work to be done and the specs - CN |
| 07/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
bore hole fenced off - no contractor onsite - CN |