Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 01/17/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Final. No Issues. City patched street which included the SW GAS cold patch. |
| 12/26/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Cold patch marked for replacment. |
| 12/11/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Talked to Trish with SW GAS she will contact contractor to correct problem and will call back. |
| 08/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
Temp patch not replaced. |
| 08/09/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Correction Required |
Expired Temp Patch. Contacted SWG to renew. |