Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/23/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 08/08/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
milled patch work on west side of alvernon to fix the issues & they are repaving it today - CN |
| 07/30/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
stopped by and checked on the paving - far west side patch will need to be redone as it was humped in the middle of the patch- called eddie from tricon - he said that he was already planning on replacing that area - pete was informed - CN |
| 07/24/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pipe installed on west side of alvernon area backfilled and has asphalt on the way to patch - CN |
| 07/23/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
started trenching and tied into the water main on the west side of alvernon - CN |
| 07/19/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
eddie from tricon had started saw cutting the roadway today - it will be about a 6 day job - told him to call me when paving and backfilling |
| 07/10/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no sign of work going on - CN |