Permit: T18RW02822

Parcel: Unknown


Addresses:

205 S CHURCH AV


Inspection Status: Passed

Inspection History: TRSP - ROW - Recurring

Permit Number - T18RW02822

Inspection Description - TRSP - ROW - Recurring

Inspection Status - Passed

Date Description Inspector Results Comments
04/01/2020 TRSP - ROW - Recurring Passed TDOT-EXCAV GENERAL INSPECTION - new pole added to the east side of church between Jackson and Ochoa. No issues all ares finalized. Electric inspections being done by DEIH
03/19/2019 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - Rick olsen in early on 3/15/19 for drilling and forming of pole foundation. Contractor asked if he could start early because of traffic congestion in area. No issues

3/18/19 new pole foundation was poured and monitored by City Electric shop. No issues. Contractor was asked to remove a section of Sono tube that was place in the foundation
01/24/2019 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - work started 1/23/19 with excavation for conduit. Contractor had permit on site and will cordinate with city electric shop when the correct time has come. No issues today
12/26/2018 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - no sign of work - CN
11/28/2018 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - no sign of work - CN
10/22/2018 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - no sign of work - CN
09/19/2018 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - no sign of work - CN
08/15/2018 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - no sign of work - CN
04/01/2020 TRSP - ROW - Recurring Bravin Approved Entered by MBRAVIN1 - new pole added to the east side of church between Jackson and Ochoa. No issues all ares finalized. Electric inspections being done by DEIH
03/19/2019 TRSP - ROW - Recurring Bravin Continued Entered by MBRAVIN1 - Rick olsen in early on 3/15/19 for drilling and forming of pole foundation. Contractor asked if he could start early because of traffic congestion in area. No issues 3/18/19 new pole foundation was poured and monitored by City Electric shop. No issues. Contractor was asked to remove a section of Sono tube that was place in the foundation
01/24/2019 TRSP - ROW - Recurring Bravin Continued Entered by MBRAVIN1 - work started 1/23/19 with excavation for conduit. Contractor had permit on site and will cordinate with city electric shop when the correct time has come. No issues today
12/26/2018 TRSP - ROW - Recurring cfarren Continued Entered by CFARREN1 - no sign of work - CN
11/28/2018 TRSP - ROW - Recurring cfarren Continued Entered by CFARREN1 - no sign of work - CN
10/22/2018 TRSP - ROW - Recurring cfarren Continued Entered by CFARREN1 - no sign of work - CN
09/19/2018 TRSP - ROW - Recurring cfarren Continued Entered by CFARREN1 - no sign of work - CN
08/15/2018 TRSP - ROW - Recurring cfarren Continued Entered by CFARREN1 - no sign of work - CN
07/05/2018 TRSP - ROW - Recurring cfarren Continued Entered by CFARREN1 - pre - con , they may be making changes according to reflect new information from TEP - they will let me know when they plan on starting work - CN
07/05/2018 TRSP - ROW - Recurring Re-inspection required TDOT-EXCAV GENERAL INSPECTION - pre - con , they may be making changes according to reflect new information from TEP - they will let me know when they plan on starting work - CN