Inspection Status: Continued
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 07/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
removed old patch and would be replacing area today - CN |
| 07/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
went back out and checked the patch work it looked good - they did have to redue the water valve collar - close permit |
| 06/26/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
left a voice mail and sent a text to dave with tricon informing him that the patch work didnt meet spec - i also sent the same text to matt and pete - CN |
| 06/26/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pete and i went and meet a forman from tricon- we talked about the patch and what needs to be fixed. he said that he would talk with dave his boss and get back to me - CN |
| 06/07/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pete and i went out to look at this jobsite as dave sent a letter to matt discussing this job and a few other jobs - while inspecting there patch it was found to be out of spec and will need to be replaced - CN |
| 05/29/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
started saw cutting asphalt to be able to pothole and install line -CN |