Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 10/15/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Job Complete. No Issues. |
| 08/08/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
TC. Right Lane shift. Perm patching water crossing. South half first, then switching to North half. PAG 2 Arterial. |
| 06/06/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Water line installed. Cold mix on trench for now until final pave. |