Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/29/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | WORK HAS BEEN COMPLETED PETE OVERSAW JOB |
|
| 06/20/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | SOUTHWEST GAS WAS WORKING IN THE DRIVEWAY OF THE TACO BELL | |
| 06/08/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | PATCH IN THE ROAD FROM A LEAKING GAS LINE. LUIS MIRANDA CALLED TO MEET ON SITE. I GAVE HIM MATT'S NUMBER |