Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/20/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | Completed. | |
| 12/19/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | North end west sidewalk and ramp formed and subgrade compacted. Ready for pour. | |
| 12/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | 7 am, Only NE sidewalk almost ready for concrete - needed compaction and ramp slope corrected. Come back at 9 am and rest should be ready per contractor. 9 a, NW sidewalk not near ready and will be scheduled for 12/19/18. |
|
| 12/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Contractor called - all sidwalks ready for concrete Critical thy have inspection 7 am on 12/18. | |
| 12/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | Went by job site no work on curb or sidewalk,light pole still in same location in the driveway. | |
| 06/22/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | No Activity. |