| 12/10/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 11/28/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
checked new ramp layout and sidewalk that they have formed up - they plan to pour today - CN |
| 11/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
helped them with the ramp and sidewalk layout - they want to pour area tomorrow - CN |
| 11/09/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
layout for sidewalk and ramp/landing were not setup as we talked about - they will re do it and call me back out - CN |
| 11/05/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no sign of work - CN |
| 10/12/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
had a meeting with concrete sub and permit holder about sidewalk - CN |
| 10/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
asked them to renew the permit as the sidewalk hasnt been poured - CN |
| 07/20/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
driveway was poured in spec they still need to pour sidewalk - CN |
| 06/22/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
looked at the compacted sg for the driveway and sidewalk also looked at the layout - CN |
| 06/14/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
looked at the forms they had started gave them some suggestions to make it work and be compliant -CN |
| 05/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pre-con, they have some issues with the tep pole and gound wire- CN |