Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 01/03/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 12/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with tucson asphalt about fixing the sink hole - CN |
| 12/07/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
still needs perm patch - CN |
| 11/14/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with chuck from tucson asphalt to fix the patch area - he took some pictures and said that he would get with tucson water - CN |
| 11/06/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
email tucson water to get the patch squared off and with in our 1/4 inch spec - CN |
| 10/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
patch work needs to be redone as its not squared off or with in the city 1/4 inch tolerance/level - email tucson water - CN |
| 08/30/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
still needs perm patch - got with matt on this one because of the sink hole - matt said that he wantes them to patch there work area - send email to tucson water to get it patched - CN |
| 07/20/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
still needs perm patch - email tucson water again - CN |
| 06/14/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
area looked the same - will email tucson water to get it repaired -CN |
| 05/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
water work done, temp patch the whole area sunk and it doesnt look like it was a tucson water issue- CN |