| 04/29/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
Final walk through complete, all asphalt patches complete and all concrete completed as well. No issues. Job is complete |
| 04/08/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
all underground work complete. Small crew still on site to finish all asphalt and concrete repair |
| 02/12/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
underground work is complete, repairing many street cuts and sidewalk repairs |
| 01/23/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
walkthrough on site with SW gas to discuss patching and concrete repairs. This projects underground has all been installed. I took this area over after most of the work has been complete. I also called in a sink hole on Simpson between Main and Myer. Gabe Rascon from streets on site and plated the area. |
| 12/26/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
working various locations of the job - CN |
| 12/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
was called out to check on a bore hole patch - talked with NPL on how the area should be patched back - CN |
| 11/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
working various locations throughout the job -CN |
| 11/16/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
they were onsite patching the last few areas on 18th to make sure that the el tour route is clear - CN |
| 11/15/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with SWG about slurrying a line on 11th and 21st - then i went and checked on 18th and 11th for the tucson water issue - tucson water was onsite and plates were still in the road - CN |
| 11/14/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
got a call from NPL about hitting a 24inch main on 18th and 11th. tucson water says they might have it fixed by thursday - its on the route for el tour so i emailed gloria and matt so they would knowwhat was going on - i went out to the site and tucson water had barely started to work and wasnt sure there planned fix would work - CN |
| 11/01/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with SWG , NPL , gloria , pete and myself about el tour fun ride route on 18th- they said that they would have it all fixed up - CN |
| 10/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
couple of crews working in various locations |
| 10/10/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out and meet with swg & npl about work being done on osborne - CN |
| 10/08/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
checked the patch work that was done on 22nd on friday - it looked good - CN |
| 10/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
asked gonzalo to repair a temp patch on 22nd as it had sank, he said he would due it tomorrow when he got traffic control setup - CN |
| 09/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out and went over work to be done on myers and 20th and how they needed to close part of the street - CN |
| 09/20/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out and addressed a complaint with NPL and swg- a nieghbore complained about compaction vibration - NPL and swg agreed to pour slurry and pave the area without using the vibe on the roller for sensative areas - CN |
| 09/19/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
got with gonzalo about patches, current work and traffic control - CN |
| 09/11/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with NPL abouut bore plans on 22nd crossing and boring on convient and simpson - CN |
| 08/13/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
couple of crews working in various locations - CN |
| 07/13/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
talked with them about patch limits and up keep on the temp patches in the work area - CN |
| 07/02/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
3 crews working various locations - CN |
| 05/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
working a few different areas in the area - CN |
| 05/16/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with NPL on 22nd and 6th repipe - working variuos locations CN |
| 05/07/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pre-con NPl job which will start tomorrow - CN |