Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 07/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 06/22/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
the asphalt tie in edges were a little high told contractor to fix it and i would re inspect it - CN |
| 06/13/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out and checked the driveway and ramps everything looked good. there was one spot on the east ramp that was close to being out of spec - pete was informed he said it would be fine - CN |
| 06/08/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out with pete and talked with contractor. there we some changes made to the driveway to make sure it was ada compliant and pete was okay with what was laid out and talked about today - CN |
| 06/08/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out & checked the recompaction effort for the driveway - CN |
| 06/07/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
helped them layout the driveway to meet ada - was asked to come back tomorrow at 7am to make sure its layed out right before they pour they asked me to have pete come along also - CN |
| 05/25/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
curb and gutter sg was good - CN |
| 05/24/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out and inspected the curb SG - told contractor that they area needed to be reworked and that he should look into renewing his permit - CN |
| 05/01/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pre-con talked about specs and work to be done- CN |