Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | WORK HAS BEEN COMPLETED NO ISSUES AT THIS LOCATION |
|
| 06/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | TEMP ASPHALT IN SIDEWALK AND STREET | |
| 06/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | EXPIRED PERMIT TEMP PATCH IS ASPHALT ASPHALT PATCH IN SIDEWALK |
|
| 05/31/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | ASPHALT PATCH IN SIDEWALK AND STREET EXPIRED PERMIT |
|
| 05/25/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | TEMP PATCH | |
| 05/08/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | NPL ON SITE, TOLD THEM TO RENEW T18RW01002 MUST REPLACE SIDEWALK PANEL |