Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 05/21/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
work completed - close permit |
| 05/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
checked the sidewalk and ramps that they poured yesturday- everything seemed to be inspec. I asked for them to clean up a few joints -CN |
| 05/17/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went out to check on the pour they had it all wrong so i told them that they must have a 2% landing and a rise of no more then 8.3% and another landing area- CN |
| 05/16/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with mike and talked about the ramp and box issues on the corner of broadway and stone - CN |
| 04/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
investigated a complaint about not being able to get into the parking garage - didnt see any issues when i was on site. i also inspected sidewalk that had been poured, also checked traffic control - CN |