Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/25/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
went out and looked at the asphalt repair it looked good - close permit |
| 06/19/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Pete and i went to a meeting with the contractor about fixing the paving issues, david from all american paving said he would take care of it tomorrow - CN |
| 06/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
talked with David from toffel and showed him the areas that need to be fixed with the paving - i also had pete come out and look he agreed - CN |
| 06/15/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
they had started to repave area - CN |
| 06/13/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pre - con for paving the new sewer line trench - talked about the needed traffic control and that they wanted to start paving friday - CN |
| 05/30/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
tieing in line on the private side - CN |
| 04/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
investigated a complaint about not being able to get into the parking garage - didnt see any issues when i was on site - CN |