Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
PRO is currently experiencing an outage. Some documents and records may not be available on PRO momentarily. We apologize for the inconvenience and are working to restore full access.
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 06/06/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
driveway was fixed - Close permit |
| 05/14/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with matt, pete myself and mike the contractor about the driveway being out of spec & requested that it be removed and replaced along with the curb that was damaged again - CN |
| 05/11/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
had pete come out and look at a few issues - we then meet with lee and he said that he would fix the issues today - CN |
| 05/11/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
i went back out and the issues werent fixed. i called lee and let him know and advised him to go out and look at it. I also notified pete and mike the permit holder that i was unable to accept it until it was redone. |
| 05/09/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with lee from lee's paving who will be fixing the driveway cross slope in driveway - CN |
| 04/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with mike about damaged curb and cross slope being out in driveway. he said that he would fix fix it and then call me - CN |