| 02/04/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
rechecked driveways and sidewalk areas, all work done with no inspection. The control joints are not in there correct places, but the driveway aprons do have a cross slope less than 2 percent. Matt Sierras informed me to close out this permit |
| 02/01/2019 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
|
| 03/19/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went back out and checked job site beacause thomas wolfgang asked if it could be closed out. i told him i had never recieved a call and the items on the nov had not been done per spec. varified onsite today, they had also added a curb that isnt to spec. |
| 02/08/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
went with pete and showed him how the driveway was only poured at 4 inches thick. matt said he would write an NOV - CN |
| 02/06/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
will discuss with matt - CN |