Permit: T18RW00187

Parcel: 140270270


Addresses:

2890 E BILBY RD


Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Permit Number - T18RW00187

Inspection Description - TDOT-EXCAV GENERAL INSPECTION

Inspection Status - Approved

Date Description Inspector Results Comments
04/03/2018 TDOT-EXCAV GENERAL INSPECTION Approved area was repaved - CLose permit
03/28/2018 TDOT-EXCAV GENERAL INSPECTION Continued contractor called me to tell me that they are repaving the drivway that was out of spec per ada. I stopped by and they were still doing the removal of the existing. They had also repoured 2 panels of concrete that was out of spec - CN
03/09/2018 TDOT-EXCAV GENERAL INSPECTION Continued contractor called me and he said that he would like to have a meeting again onsite with his subs to talk about the work that needs to be redone. I had pete come out with me so that he could see the issues with the driveway and the 2 panels of sidewalk that needed to removed and replaced. pete agreed with what i had pointed out as being out of spec and the contractor said that he would get it all fixed.
03/08/2018 TDOT-EXCAV GENERAL INSPECTION Continued had a meeting with the contractor at 110:30am to talk about 2 sidewalk panels that needed to be replaced, we also talked about an area of the driveway asphalt that needs to be replaced as it doesnt meet ada requirements - CN
01/30/2018 TDOT-EXCAV GENERAL INSPECTION Continued went out and checked the ramps and sidewalk was good, tucson water will be removing at least 1 panel in roxw that will need to be rechecked - CN
01/17/2018 TDOT-EXCAV GENERAL INSPECTION Continued went out and inspected the sidewalk and ramps showed them a few issues to be fixed - CN
01/11/2018 TDOT-EXCAV GENERAL INSPECTION Continued meet with the contractor and concrete sub to make sure they understood the new ramp designs before they were to pour today - CN - 8am to 8:40 am
01/10/2018 TDOT-EXCAV GENERAL INSPECTION Continued meet with the contractor about curb forms and made sure that he knew he needed to follow the 2015 standards. contractor and his sub was told to look up the specs as they didnt have them before they poured the curb in row tomorrow - CN