Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
Permit Number - T18RW00083
Inspection Description - TDOT-EXCAV GENERAL INSPECTION
Inspection Status - Approved
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/26/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | - work completed - close permit | |
| 02/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | they called me out to inspect the rehbar before pouring today at 1pm | |
| 02/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | went back out and checked on the pour they forgot about the collars for the 2 sewer MH so they will pour those tomorrow -CN | |
| 01/30/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | - showed up at noon they were milling edges to resses steel plates in the roadway, they are also still drilling and cleaning for the rebar install, they are to be off the roadway by the end of the day per down town. - CN | |
| 01/30/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | - I stopped back by and they had started to install the dowls and everything looked to be going well and according to spec - CN | |
| 01/29/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | drilling for dowls to be able to pour concrete cap - CN | |
| 01/23/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | had a meeting about the type b patch, i told jim that i would have to follow the detail, he said that he would talk with lance about making a few adjustments to our detail- CN | |
| 01/18/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | stopped in and checked on there progress and checked the traffic control - CN | |
| 01/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | trenching for sewer install - CN | |
| 01/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | started trenching and laying new sewer line. i told eagle rock to make sure there traffic control is checked daily and is correct as i found a sign tunred and one knocked over - CN | |
| 01/09/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | - re looked at the traffic control since it took them most of the day to move it yesterday - matt and the office were no be notified that the traffic control needed to be adjusted as it didnt fit as they had drawn it up on the plans - CN | |
| 01/08/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | - helped them to get the traffic control set up per plan, they also moved the fence line out to the roadway from canyon builders sidewalk closure. I asked them to send the changes into the down town office.- CN | |
| 01/05/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | pre-con from 8:am to 8:30 they will be starting monday - CN |