Inspection History Details
Permit: T18RW00032
Inspection Status: Correction Required
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Correction Required | TRAFFIC CONTROL WAS SET UP AT 730 RIGHT LANE CLOSURE WITH NO ARROW BOARD. SPOKE WITH CONTRACTOR . TRAFFIC CONTROL COMPANY PULLED UP ON SITE AS I WAS STANDING THERE |
|
| 08/10/2018 | TDOT-EXCAV GENERAL INSPECTION | Approved | WORK HAS BEEN COMPLETED T.A. | |
| 07/30/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | TRAFFIC CONTROL IS OK PACE IS ON SITE |
|
| 02/13/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | MIKE B. TOOK OVER FOR PIA | |
| 02/05/2018 | TDOT-EXCAV GENERAL INSPECTION | Continued | PLACING WATER LINE FROM HYDRANT TO KLIEN TANK | |
| 02/01/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | NOT IN ROW | |
| 01/17/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | CLEARING BRUSH BEHIND ROW | |
| 01/16/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | WORKING BEHIND ROW | |
| 01/12/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection | ||
| 01/09/2018 | TDOT-EXCAV GENERAL INSPECTION | Not ready for Inspection |