Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

The login landing page when selecting 'View' is still occurring and is still pending further investigation. 

Permit: T18RW00024

Parcel: 116292880

Inspection Status: Approved

Inspection History: TDOT-EXCAV GENERAL INSPECTION

Date Description Inspector Results Comments
02/01/2019 TDOT-EXCAV GENERAL INSPECTION Approved Inspections done by Jack Kokot, PIA inspector
05/25/2018 TDOT-EXCAV GENERAL INSPECTION Continued called jack and he said that they are still working
02/27/2018 TDOT-EXCAV GENERAL INSPECTION Continued Shoulder work continues with daytime TC set up
02/09/2018 TDOT-EXCAV GENERAL INSPECTION Continued 2nd Utility patch complete working in shoulder area
02/08/2018 TDOT-EXCAV GENERAL INSPECTION Continued Pave 2nd utility crossing
02/07/2018 TDOT-EXCAV GENERAL INSPECTION Continued Utility crossing continues
02/06/2018 TDOT-EXCAV GENERAL INSPECTION Continued Start 2nd utility crossing on S/Side of Starr Pass on Greasewood
02/06/2018 TDOT-EXCAV GENERAL INSPECTION Continued Start 2nd utility crossing on Greasewood on S/Side of Starr Pass at intersection
02/02/2018 TDOT-EXCAV GENERAL INSPECTION Continued Crew potholing for 2nd utility crossing S/W corner Greasewood and Starr Pass
01/31/2018 TDOT-EXCAV GENERAL INSPECTION Continued Pave utility crossing on Greasewood
01/30/2018 TDOT-EXCAV GENERAL INSPECTION Continued Began utility crossing on Greasewood 500 FT south of Starr Pass
Work monitored with PIA permit T17PI00034 work
01/24/2018 TDOT-EXCAV GENERAL INSPECTION Continued Working on water line S/B Bike lane and shoulder.
TWater insp. Eddie Frias on site
Work monitored under PIA #T17PI00034
01/19/2018 TDOT-EXCAV GENERAL INSPECTION Continued talked with tom about the utility work he said that pia could watch it - CN