Inspection Status: Approved
Inspection History: TDOT-EXCAV GENERAL INSPECTION
| Date |
Description |
Inspector |
Results |
Comments |
| 08/31/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Approved |
areas that were looked at by pete and i have been replaced - Close permit |
| 07/31/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
npl onsite milling bad patched areas - CN |
| 07/24/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
jimmy said he was hoping to start this week on fixing the patches - CN |
| 06/22/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
pete and i had a meeting with jimmy from NPL & he will replace 4 patches along valencia - CN |
| 06/19/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
got with jimmy and he said that he would get back with me on a time and day to meet this week to look at the patches that need to be redone - meeting set for friday at 8am - CN |
| 05/22/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
Meet with jimmy from npl showed him 4 bad patches along valencia from the pizza hut to the big o tire- i recommened that they use a straight edge while paving and when they repave these areas- CN |
| 05/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
no work going on, not all patching complete -CN |
| 04/27/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- drove the patches done by NPL they are still rough. i asked matt to drive them over the weekend so that i could get another opinion on it before telling NPL to redo it - CN |
| 04/18/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
called jimmy with NPL and let him know that when i drove the first couple of patches they did and they were a little rough over by pizza hut - CN |
| 04/03/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
meet with jimmy from npl and they had started paving and dowling, pouring concrete along valencia. work is slow going and it will take them another 3 weeks or so to finish - CN |
| 02/26/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- meet with npl jimmy, pete and myself to go over paving and concrete patching on valencia - CN |
| 02/23/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- working on gas tie ins - CN |
| 02/12/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
- had a meeting with SWG and bryan from npl , pete , myself to talk about the driveway @ headly "patch" issue. the resolution was pushed higher to david, lance and matt - CN |
| 01/30/2018 |
TDOT-EXCAV GENERAL INSPECTION |
|
Continued |
NPL installing gas line along valencia - CN |