Inspection History Details
Inspection Status: Correction Required
Inspection History: SIGN SITE REVIEW
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/12/2018 | SIGN SITE REVIEW | Correction Required | Needs Site Plan. Needs drawing revised. Email with full explanation sent on 7/11/18. |