Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Passed
Inspection History: SPECIAL INSPECTION - Sign Footing (Third Party)
Permit Number - T18OT00904
Inspection Description - SPECIAL INSPECTION - Sign Footing (Third Party)
Inspection Status - Passed
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
05/29/2019 | SPECIAL INSPECTION - Sign Footing (Third Party) | DROBERTS | Approved | Entered by DROBERT5 - MET WITH JACK ON SITE AND DISCUSSED WHAT WAS HAPPENING WITH THE SIGN. IT WAS CHECKED AND HAS BEEN APPROVED FOR POURING OF THE FOOTER. THE SETBACK NOTED BY RON DURING YESTERDAYS INSPECTION IS FOR THE SIGN ITSELF NOT THE WALL THAT THEY ARE POURING AT THIS TIME. |
05/24/2019 | SPECIAL INSPECTION - Sign Footing (Third Party) | RLEDONNE | Not ready for Inspection | Entered by DMERANZ1 - Set back is not the same as approved plans. |
11/06/2018 | SPECIAL INSPECTION - Sign Footing (Third Party) | RLEDONNE | Partial Approval | Entered by CBELL1 - Sign footer on the corner of Houghton and Drexel footer okay only |