Inspection Status: Passed
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 06/19/2018 |
COT - ENGR - Signage Final |
hthrall |
Continued |
Entered by HTHRALL1 - MET WITH CONTRACTOR TO DISCUSS PROPOSAL AND SPECIAL INSPECTION FOR ATTACHMENT. |
| 08/14/2018 |
COT - ENGR - Signage Final |
hthrall |
Continued |
Entered by HTHRALL1 - REVISED PLANS RECEIVED, INCLUDES A SPECIAL INSPECTOR SHEET AND ENGINEERING DIAGRAM. |
| 06/20/2018 |
COT - ENGR - Signage Final |
hthrall |
Continued |
Entered by HTHRALL1 - PERMIT T18OT00868
SITE: 40 E CONGRESS / HEXAGON MINING
(1) INTERNALLY ILLUM WALL SIGN
REVIEWER: H.THRALL
DATE: 6/20/18
REZONING: OCR-2 / C9-06-25 - NO SIGNAGE CONDITIONS
1) NEEDS ENGINEERED PLANS FOR ATTACHMENT TO CONCRETE LEDGE AT 4TH STORY OF BUILDING.
2) NEEDS SPECIAL INSPECTION FOR METHOD OF ATTACHMENT.
3) INSTALL NEEDS TDOT APPROVAL WITH SUNLINK FOR STREETCAR.
4) PERMIT TO WORK IN RIGHT OF WAY REQUIRED THROUGH TDOT.
|
| 08/16/2018 |
COT - ENGR - Signage Final |
hthrall |
Approved |
Entered by HTHRALL1 - REVISED ENGINEERING RECEIVED FOR PROPER BOLT. SIGNED/SEALED 8/16/18 - AND APPROVED. SPECIAL INSPECTION SHEET APPROVED FOR POST INSTALL BOLT ANCHOR AND JULIAN VALDEZ AS SPECIAL INSPECTOR. |