Inspection Status: Approved
Inspection History: SIGN ELECTRIC
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/16/2019 | SIGN ELECTRIC | Approved | THE WIRING WITHIN SOME OF THE ENCLOSURES HAVE BARE WIRES, NICKS IN THE INSULATION SHEATHING, NO LOCK OUT SWITCHES ON ANY OF THE BOXES, POSSIBLE GROUNDING ISSUES IN TWO OF THE FOUR LOCATIONS. THE CONTRACTOR WILL BE MAKING THE NECESSARY REPAIRS IF POSSIBLE TODAY AND WILL PROVIDE PHOTOGRAPHS OF EACH LOCATION. THE ELECTRICAL PANELS APPEAR TO BE IN ORDER, ALL ARE MARKED AND HAVE 20 AMP FUSES FOR EACH SWITCH. FINAL NOT TO BE GIVEN TILL THE PHOTOS HAVE BEEN VIEWED AND APPROVED. |
|
| 08/07/2019 | SIGN ELECTRIC | Not ready for Inspection | Contractor not able to meet on site. | |
| 07/03/2019 | SIGN ELECTRIC | Partial Approval | FINAL NOT TO BE GIVEN TILL ALL WORK IS APPROVED. |