Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
| Date |
Description |
Inspector |
Results |
Comments |
| 10/27/2022 |
COT - ENGR - Signage Final |
|
Not Ready |
|
| 03/08/2018 |
COT - ENGR - Signage Final |
BWIESE |
Approved |
Entered by BWIESE1 - This permit is ready to be paid for and picked up.
Your stamped & issued sign permit must be on site during install.
You can pick up your permit from 8am -11:30am at the Sign Desk
201 N Stone Ave, 1st floor, North side of building.
In person you can pay, cash, check, or charge.
|
| 08/31/2018 |
COT - ENGR - Signage Final |
DROBERTS |
Partial Approval |
Entered by DROBERT5 - PROVIDE PHOTOS OF THE SITE SHOWING THE PENETRATIONS AND THE ATTACHMENTS, AND PROVIDE PHOTOS OF THE ELECTRICAL FOR THE SIGN AND THE CONNECTION(PICTURE OF THE WIRENUTS AND GROUNDING) |
| 05/24/2018 |
COT - ENGR - Signage Final |
DROBERTS |
Denied |
Entered by DROBERT5 - NO ONE ON SITE TODAY FOR THE CONTRACTOR. THE CONTRACTOR MUST BE ON SITE FOR ALL INSPECTIONS IF THERE IS ELECTRICAL ATTACHED. |