Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit: T18OT00234

Parcel: 10511061R

Inspection Status: Not Ready

Inspection History: COT - ENGR - Signage Final

Permit Number - T18OT00234

Inspection Description - COT - ENGR - Signage Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
10/27/2022 COT - ENGR - Signage Final Not Ready
10/27/2022 COT - ENGR - Signage Final Not Ready
07/27/2022 COT - ENGR - Signage Final bwiese1 Not ready for Inspection Entered by BWIESE1 - needs time
06/15/2018 COT - ENGR - Signage Final BWIESE1 Approved Entered by BWIESE1 - Once the deferred building facade plan is approved, this permit is ready to be paid for and picked up. Your stamped & issued sign permit must be on site during install. You can pick up your permit from 8am -11:30am at the Sign Desk 201 N Stone Ave, 1st floor, North side of building. In person you can pay, cash, check, or charge.
06/14/2018 COT - ENGR - Signage Final hthrall1 Continued Entered by HTHRALL1 - RE: status of sign permit For: Dick's Sporting AT: 4500 N Oracle Road #275 Permit: T18OT00234 Reviewer: H. Thrall Date 6/14/18 - just updating Sign area allowance and sign locations ok. Needs special inspection for mounting to wall system. Wall system pending permit as deferred submittal under original shell building permit (T17CM06925). Still waiting for building shell to have deferred submittal provided and reviewed for exterior wall entry system (that includes sign mounted to that). A deferred submittal would be sealed by engineer as such, and attached to shell building plan T17CM06925 for Dick's Sporting Goods. Sign permit can be released when the shell building deferred submittal for the wall entry system is approved (again, sign is mounted to this wall entry system and it is reviewed under separate permit).
02/28/2018 COT - ENGR - Signage Final bwiese1 Partial Approval Entered by BWIESE1 - Builing permit must be issued and paid for before sign review can be conducted.