Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Not Ready
Inspection History: COT - ENGR - Signage Final
Permit Number - T18OT00184
Inspection Description - COT - ENGR - Signage Final
Inspection Status - Not Ready
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/27/2022 | COT - ENGR - Signage Final | Not Ready | ||
02/21/2018 | COT - ENGR - Signage Final | HTHRALL | Approved | Entered by HTHRALL1 - Revision sent by contractor 2/20/18 approved |
02/16/2018 | COT - ENGR - Signage Final | HTHRALL | Partial Approval | Entered by HTHRALL1 - RE: T18OT00184 AT: 5870 E BROADWAY BLVD, SUITE 130 FOR: BOBA TEA REVIEWER: H.THRALL DATE: 2/16/18 1) PROVIDE DETAILED MOUNTING FOR BOTH THE PROJECTING SIGN (I.E. NUMBER/SIZE OF BOLTS/SCREWS FOR WALL PLATE / BRACKETS/ SUPPORTS ARMS.) IF NECESSARY, PROVIDE SIDE VIEW ELEVATION TO SHOW. 2) ILLUMINATED PROJECTING SIGN PROVIDE TIMER NOTATION. 3) SIGN AREA / SIGN TYPES ALLOWED. 4) PER YOUR REQUEST FOR FEE BREAKDOWN: PERMIT FEE: $145 (NEW, PERMANENT SIGNS - PER PERMIT) INSP FEE: $58.30 (ELECTRICAL WITH 1 CIRCUIT ARCHIVE FEE: $16.50 TOTAL FEE: $219.80 (FYI - 1/2 HR STRUCTURAL & ELECTRICAL REVIEW FEES EACH OF $41.25 NOT CHARGED, SIGN STAFF ABLE TO EXAMINE VS. PLANS EXAMINERS) 5) EMAIL REVISED SHEET FOR MOUNTING & TIMER NOTATION TO HEATHER.THRALL@TUCSONAZ.GOV |