Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/19/2019 | FIRE SPKLR - FINAL | Approved | ||
| 02/20/2019 | FIRE SPKLR - FINAL | Partial Approval | Spacing and location of heads ok. Some areas still need drop ceiling installed. Verify all ceilings at Fire Final. 60 psi static -Remove sprinkler excess heads in two electrical rooms & install trim in mens restroom and room 107c 50 psi residual |