Inspection Status: Passed
Inspection History: COT - FCON - Underground Pressure
| Date |
Description |
Inspector |
Results |
Comments |
| 09/17/2019 |
COT - FCON - Underground Pressure |
JPEELDAVIS |
Approved |
Entered by JPEELDA1 - All systems have been pressure tested to and from the fire pump. Need to perform the flush of the entire fire sprinkler line. |
| 04/11/2019 |
COT - FCON - Underground Pressure |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - Phase 4 approved |
| 11/14/2018 |
COT - FCON - Underground Pressure |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - Phase 3 approved |
| 11/07/2018 |
COT - FCON - Underground Pressure |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - Phase 2 approved |
| 10/30/2018 |
COT - FCON - Underground Pressure |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - Phase 1 approved |
| 10/16/2018 |
COT - FCON - Underground Pressure |
JPEELDAVIS |
Cancelled |