Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/30/2018 | FIRE SPKLR - FINAL | Approved | ||
| 11/13/2018 | FIRE SPKLR - FINAL | Denied | When flowing pressure dropped below 5 psi and when closed reset to approximately 50 psi. Check for leak or other situation. Contractor advised that there was a break in the main recently. Inspection #2 Also correct as built is needed floor plan is incorrect. It was verified with contractor. |