Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/09/2018 | FIRE SPKLR - FINAL | Approved | Also performed a flush of the riser before filling for final. Waterflow was at 34 seconds. |