Inspection Status: Approved
Inspection History: FIRE - KITCHEN EXH HOOD FINAL
| Date |
Description |
Inspector |
Results |
Comments |
| 10/17/2018 |
FIRE - KITCHEN EXH HOOD FINAL |
|
Approved |
|
| 10/04/2018 |
FIRE - KITCHEN EXH HOOD FINAL |
|
Denied |
1. Per the business owner, the inspection needs to be done after business hours. This needs to be scheduled ahead of time. |
| 08/23/2018 |
FIRE - KITCHEN EXH HOOD FINAL |
|
Denied |
Denied. Contractor failed to inform the business owner of the process required to conduct an acceptance test. Owner did not want the test conducted at the time American Fire scheduled. I was cancelled on scene by american fire. Reinspection fee added to permit. Must be paid paid prior to next inspection. |