Inspection History Details
Inspection Status: Approved
Inspection History: FIRE - ALARM FINAL
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/13/2019 | FIRE - ALARM FINAL | Approved | Per Systems | |
| 11/08/2018 | FIRE - ALARM FINAL | Partial Approval | 1. Tested horn/strobes, water flow, tamper switch, pull station, and smoke above FACP. All ok. 2. All signals report to Central Station. 3. Need to test Heat Detectors and Elevator Recall. 4. Ok for TCO of 2nd Floor. |