Inspection Status: Partial Pass
Inspection History: COT - FCON - Alarm - Final
| Date |
Description |
Inspector |
Results |
Comments |
| 11/15/2018 |
COT - FCON - Alarm - Final |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - 6th floor tested and approved |
| 10/30/2018 |
COT - FCON - Alarm - Final |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - 3rd, 4th and 5th floor tested |
| 07/24/2018 |
COT - FCON - Alarm - Final |
JPEELDAVIS |
Partial Approval |
Entered by JPEELDA1 - Tested the Basement, 1st and 2nd floor complete fire alarm. Left the two smoke detectors located on the Jackson side enterance covered and did not test due to construction dust. Also, did not test the fire alarm devices in the stirwells due to construction dust. Tested the notification devices in the hallway on floors 3-6. 6th floor notification needs to be synchronized. Electrical rooms floors 3-6 need to be sealed and protected from construction debris prior to TCO for the Basement, 1st and 2nd floors. Water flows were as follows:
Basement: 39 seconds
1st floor: 55 seconds
2nd floor: 39 seconds
3rd floor: 49 seconds
4th floor: 25 seconds
5th floor: 28 seconds
6th floor : 30 seconds |