Inspection Status: Partial Pass
Inspection History: COT - FCON - Underground Flush
| Date |
Description |
Inspector |
Results |
Comments |
| 04/13/2018 |
COT - FCON - Underground Flush |
jvincent |
Partial Approval |
Entered by JVINCEN1 - Flush approved. See all previous notes.
Need to verify status of permit for 10" supply to pump room. This section is not permitted. GC to contact HBrown to discuss. |
| 04/12/2018 |
COT - FCON - Underground Flush |
jvincent |
Correction Required |
Entered by JVINCEN1 - Notes only. Still needs all inspections.
1) Work without permits and reinspection fee added to this permit. Must be paid prior to full final approval.
2) UG hydro pending Inspector Basalduas decision. UG installed and buried without permits and without a TFD inspection.
3) UG test cert required prior to full final approval.
|