Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: FIRE SPKLR - FINAL
Permit Number - T18FC00064
Inspection Description - FIRE SPKLR - FINAL
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
01/24/2019 | FIRE SPKLR - FINAL | Approved | ||
01/22/2019 | FIRE SPKLR - FINAL | Partial Approval | ||
01/17/2019 | FIRE SPKLR - FINAL | Denied | Re-inspection fee added shall be paid prior to next inspection. 2nd floor TCO inspection not granted. *219 - Replace missing escucheon in closet *219/218 or 217 fill in gap in closet *217 MB escucheon * 215 front closets (painted heads) taped, escucheon missing * 214 seal gap * 211 painted head right hallway * 210 escucheon missing, painted head * 209 missing light fixture in bathroom * 208 escucheon missing front closet * 207 sprinkler needs to be recessed * 206 painted head, sink missing - Make sure caps and tape are off FA horns and extinguishers in place. |
|
12/20/2018 | FIRE SPKLR - FINAL | Partial Approval | Outside Room 411 needs to have 2 escutcheons in place Outside Room 411 escutheon needs painting and drywall completed Room 413 closet head is painted x 2 Room 414 2 heads capped and need escutcheon Room 414 bedroom closet head is painted Room 415 closet head has dry wall on it Room 416 linen closet head is painted Room 417 heads are taped and need escutcheons in place Room 408 closet front side head is painted Room 407 outside the front closet is painted, kitchen head needs dry wall, paint and ecutcheon Room 405 bathroom and closet head are painted. Both heads in the other bathroom are painted and need drywall corrected Room 305 hallway head needs drywall and is painted Room 311 head front entry is painted. Head located in the kitchen needs paint and drywall corrected Room 313 front entry head is too close to the wall need to move Room 314master bathroom closet head to close to the wall need to move Room 315 2 back bedroom heads back side of fans are painted Room 315 Kitchen light obsturcted needs to be lowered Room 316 kitchen light is obsturcted needs to be lowered Room 317 kitchen light is obstructing needs the head to be lowered Room 317Master bathroom head is painted Room 318 bathroom closet head is too close to the wall and needs to be moved Room 319 closet head is to close to the wall and needs to be moved Ceiling outside Rooom 219 heads are taped Room 218 Front enrtry head is painted Room 217 Master bathroom head is painted Living room head needs to have the drywall corrected. Front entry head is painted and needs to be replaced. Bedroom entry area head is painted and needs to be replaced Room 216Kitchen light is obstructing the head and it needs to be lowered Room 216 Front entry head is painted, closet by entry too close to the wall needs to be moved and is painted, back bedroom head is painted, small side closet painted head and back bathroom has a painted head Outside Room 215 head is taped Room 215 kitchen light is causing an obstruction head needs to be lowered, master bedroom head needs the drywall to be corrected, master bathroom closet head is painted, front entry head is painted, bedroom 1 closet head is taped and needs escutcheon, bedroom 2 closet and bathroom have heads that are painted Room 214 Entry to back bedroom capped off and in the bedroom needs trim and checked for paint Room 213 Small closet by the bedroom head is painted. Back bedroom head is capped and needs trim and checked for paint Room 210 closet head painted front entry Room 209 closet head is painted Room 208 closet head needs drywall, paint, kitchen head is obsturcted by the light and needs to be lowered Room 207 linen closet head is too clsoe to the wall and needs to be moved same with the laundry head Standpipes need to be capped. |
|
11/29/2018 | FIRE SPKLR - FINAL | Partial Approval | Room 111 closets have a total of 3 heads that are twisted Room 111 bathroom has a head that needs to be replaced Room 110 Kitchen area has a head that needs to be tweaked Room 110 has a head in the bathroom that needs to be adjusted Mechanical room on the 1st floor east area needs to have a head added because it is covered with drywall Room 113 bedroom areas have 2 heads that need to be corrected Room 113 has a head in the closet that has tape on it and needs an escutcheon added Room 113 hallway head is painted and needs to be replaced Room 115 bathroom head needs to be adjusted/ replaced Room 104 has a painted head in the bathroom Room 105 laundry room has a painted head Room 107 head painted in the kitchen that also needs to be lowered since it is obstructed by the light fixture Room 107 painted heads in the laundry and bathroom areas Room 116 hall head needs to be corrected Room 116 closet and hall heads are painted Add head in the fire riser room Add heads under the garage door in the basement Add head in the mutli purpose room Remove two heads in the hall outside of the offices Rotate all hose connection so that they are not pointing in the down position. The bike room has two heads that are painted |
|
11/15/2018 | FIRE SPKLR - FINAL | Revision | 2018.11.15 1. TCO a. Phasing plan - 1st floor first and then turn-key remainder b. No egress or life safety issues outstanding Sprinkler complete (all aspects, incl. labeling, signage, monitoring) c. Establish the completion of the fire safety system overall Unfinished floors - egress paths only d. All Exit signs, emergency lighting, stair marking throughout e. Exterior accessibility and egress f. Street side parking for each of the occupied units i. Construction access - Three stairwells 2. CofO a. All development package items 2-3 weeks b. Final authorization to discharge in 2 weeks |