Case: T18DV08040

Parcel: 11615077K

Inspection Status: Approved

Inspection History: INSP - FOLLOW UP CODE ENFORCE

Case Number - T18DV08040

Inspection Description - INSP - FOLLOW UP CODE ENFORCE

Inspection Status - Approved

Date Description Inspector Results Comments
12/13/2018 INSP - FOLLOW UP CODE ENFORCE Approved ARRIVED ON SITE, TEP HAD KILLED POWER. SCOTT SNELL ARRIVED WITH THE GENRATOR, E2 POWER SYSTEMS THE ELCTRICAL COMPANY WAS ON SITE PREPARING ELECTRICAL HOOK UP TO THE GENERATOR. ENGINEER IS TO ARRIVE AT 1:00 PM AT WHICH TIME WE WILL BE INFORMED WHAT WILL BE REQUIRED FOR EXPOSED AREA BELOW THE BUILDING AND HOW MUCH PIPE AND UNDERMINED AREA WILL BE REQUIRED TO BE EXPOSED. RICK HOLLANDER WILL MEET WITH DSD TO EXPLAIN THE ISSUE AND DETERMINE WHAT TYPE OF PERMIT WILL BE REQUIRED.
12/13/2018 INSP - FOLLOW UP CODE ENFORCE Approved Arrived on site anf found worker working under slabs. Warned that they should wait for structural engineer before continuing. Electrician is finished with temp power. Called and asked for conductor strain relief at term cans. He will send some one back to take care of.
Structural engineer came and gave directions to person in charge for shoring.
12/13/2018 INSP - FOLLOW UP CODE ENFORCE Approved REVISITED THE SITE, MET WITH PROPERTY MANAGER, ENGINEER STEVEN HESS AND RICK HOLLANDER. WENT OVER THE INSTRUCTIONS WITH THE ENGINEER AND SCOTT SNELL OF CAMCO, ENGINEER EXPECTS 16" X 16" CMU PEERS UNDER THE CONNER OF THE BUILDING A 2ND PEER APROX 6-8 FT AWAY UNDER THE FOOTING AND A 3RD PEER UNDER THE CONCRETE DOORWAY SLAB BEFORE WORK BEGINS TO REPLACE PIPE TO THE RISER. ONCE PIPE IS REPLACED, THE DRIVE AREA CAN ALSO BE REMOVED TO DETERMINE HOW MUCH PAVEMENT WAS UNDER MINED.