Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/05/2018 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE, MET WITH TFD, VERY NORTH STRUCTURE "F" WAS AFFECTED BY FIRE, ALL METAL GARAGE TYPE DOORS, ROLL UP DOORS, WERE CUT BY FIRE TO OBTAIN ENTRY. THERE WERE A TOTAL OF 11 UNITS IN STRUCTURE "F", UNIT 11 DID NOT CATCH FIRE, UNIT 10 FIRE WAS MINIMAL BUT HAD ITEMS THAT NEEDED TO BE PUT OUT. UNITS 7, 8, AND 9 WERE TOTAL LOSSES. UNITS 1 THRU 6 HAD LARGE HOLES CUT IN THE DOORS BUT WERE NOT AFFECTED BY FIRE. >S/W GAS STATED THERE WAS NO GAS ON THE PROPERTY, DID CHECK LINES IN THE ALLEY WAY FOR LEAKS. >ELECTRICAL SERVICE PANEL FOR STRUCTURE "F" AT THE WEST END OF THE BUILDING HAD ALL BREAKERS SHUT OFF, AND THE MAIN SERVICE PANEL IN THE GATED AREA AT THE WEST END OF THE STORAGE AREAS. >EACH UNIT HAD 2 LIGHT FIXTURES IN EACH UNIT AND WERE TURNED ON BY A TIMER AT THE SERVICE PANEL. >FRONT AND REAR WALLS OF THE UNIT WERE CONCRETE, PARTING WALLS AND ROOF WERE STEEL FRAME AND CORRIGATED METAL WALLS AND ROOF. >CUBESMART SROEAGE STRUCTURES WERE COMPLETELY FENCED ALL FOUR SIDES. >MANAGER ON SITE TRIED CONTACTING THE REGIONAL MANAGER, RECEIVED NO ANSWER OR CALL BACK. >NOV ISSUED FOR PERMITS REQUIRED AND SIGNED FOR BY THE MANAGER |