Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO.
If you cannot find what you are looking for please
submit a records request.
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date |
Description |
Inspector |
Results |
Comments |
| 12/20/2018 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Spoke with the Architect and he has had some medical setbacks but is almost ready for submittal. He has the ramada work done and is working on the building. |
| 12/07/2018 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Property locked up. Can still see NOV and Stop Work Order posted. Called and left message to call me. |
| 10/30/2018 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Property locked up. Can still see NOV and Stop Work Order posted. Called and left message to call me. |
| 09/27/2018 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Work is still in progress and no permit at this time. Posted new "Stop Work" order. Called contact and let him know to stop all work. |
| 08/02/2018 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Met with plans reviewers to discuss findings. |
| 08/02/2018 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Met with Abram Salas. We viewed the entire progect, rooms and roof. New duct work and A/C units have been installed. We discussed what was done in the different rooms. It was pointed out the usage of NM Cable may not be allowed. A attic wall to the sanctuary had holes and may be a fire wall. We discussed the stages in both areas. We discussed the new scupper drains in the exterior walls. Took more pictures. |
| 08/02/2018 |
INSP - FOLLOW UP CODE ENFORCE |
|
Approved |
Spoke with the Building Official about the project. |