Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
Case Number - T18DV03956
Inspection Description - INSP - INITIAL CODE ENFORCMENT
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
07/09/2018 | INSP - INITIAL CODE ENFORCMENT | Approved | Office called that T.P.D. on site with a car through building. Arrived and the unit still on site and the vehicle hit the pop out that divides the units. The metal window frame is OK and the door was not damaged. The metal studs are structual and have been damaged only by the window frame. The pop out was damaged and will need to be re-built with stucco on the exterior of the building. The office will be able to remain opened and the contractor on site checking the damage. The area will be secured by the contractor. The contractor signed the paperwork on site. RV. |