Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/31/2018 | INSP - FOLLOW UP CODE ENFORCE | Approved | ON SITE; PER OWNERS REQUEST, VIOLATION ABATED. CLOSE CASE. | |
| 06/26/2018 | INSP - FOLLOW UP CODE ENFORCE | Approved | ON SITE; MILL PILE REMAINS, TOOK PICTURES TO ISSUE COURT CITATION. | |
| 06/19/2018 | INSP - FOLLOW UP CODE ENFORCE | Approved | SPOKE TO SUSANA WHO LIVES AT ADDRESS AND IS DOING THE WORK, SHE SAYS AN INSPECTOR WENT OUT FROM STORMWATER AND SAID SHE WAS OKAY TO DO THE WORK SHE IS DOING WITH REGARDS TO FILLING IN THE DRAINAGE AREA WITH ASPHAULT MILL. INSPECTOR BERMUDEZ SPOKE TO NEIGHBOR AND HE SENT IN PICTURES SHOWING MILL PILE STILL IN STREET AND STORM WATER BACKED UP INTO STREET DUE TO THE WORK MILL MOUND IN THE STREET. INSPECTOR BERMDUEZ IS RESEARCHING WITH STORMWATER WORK ORDER PLACED ON 6.1.2018. | |
| 06/19/2018 | INSP - FOLLOW UP CODE ENFORCE | Approved | STORM WATER INSPECTOR BELL MONG 429-3287, INSPECTED THE DRAINAGE AREA REPORTED AND CONFIRMS THAT THERE IS NO BLOCKAGE TO THE DRAINAGE AREA THE WATER CAN FLOW AROUND THE MILL PILE IN THE STREET AT THIS TIME AND THE MILL BEING FILLED INTO THE DRAINAGE AREA IS ALSO NOT BLOCKING THE DRAINAGE FLOW. INSPECTOR MONG INDICATED THAT SHE WILL BE BACK OUT ON MONDAY 6/26/18 AS SHE ADVISED THE PROPERTY OWNER TO REMOVE THE MILL PILE FROM THE STREET BEFORE THEN. INSPECTOR BERMUDEZ EXPLAINED TO INSPECTOR MONG THAT THE NOV SENT TO THE OWNER WAS TO BE FOLLOWED UP TODAY HOWEVER BERMUDEZ WILL ALLOW UNTIL TUESDAY 6/26/18 TO FOLLOW UP ON MILL PILE. INSPECTOR BERMUDEZ WILL ISSUE A COURT CITATION IF THE MILL PILE REMAINS IN THE STREET RIGHT OF WAY. INPSPECTOR BERMUDEZ ALSO NOTIFIED COMPLAINTANT MR. RAMSEY REGARDING INSPECTOR MONG'S FINDINGS. MR. RAMSEY WAS VERY UPSET AND SAID HE WOULD BE CONTACTING THE COUNCIL OFFICE AND THANKS CODE ENFORCEMENT FOR DOING THEIR DUE DILIGENCE REGARDING THE DRAINAGE PORTION OF THE COMPLAINT. |