Inspection History Details
Inspection Status: Approved
Inspection History: INSP - INITIAL CODE ENFORCMENT
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2018 | INSP - INITIAL CODE ENFORCMENT | Approved | VISITED SITE, FIRST MET WITH MANAGER JENNIFER WHO STATED SHE JUST TOOK OVER A MONTH AGO AND INFORMED ME OF ELECTIRCAL PROBLEMS AND THE NEED TO CHANGE OUT HOTWATER HEATER BECAUSE OF THE CHANGE TO PROPANE. I THEN MET WITH THE OCCUPANT OF THE TRAILER THAT SHE OWNS. SHE STATED PROBLEMS ARROSE WITH THE HOTWATER HEATER WHEN THEY CHANGED OUT ELECTRICAL AND THEN STATED THEY NEEDED TO CHANGE THE HOTWATER HEATER (CONVERT FROM GAS TO PROPANE) BOTTOM LINE WAS THERE WERE NO PERMITS. NOV WAS ISSUED FOR THE WORK WITHOUT PERMITS FOR THE NEW HOTWATER HEATER. OWNER ADAM SIGNED FOR THE NOVWITH 7 DAYS TI CORRECT, |