Inspection History Details
Inspection Status: Approved
Inspection History: INSP - FOLLOW UP CODE ENFORCE
Case Number - T18DV00257
Inspection Description - INSP - FOLLOW UP CODE ENFORCE
Inspection Status - Approved
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
09/02/2018 | INSP - FOLLOW UP CODE ENFORCE | Approved | AFTER THE FIRE AT THE "MARK" BUILDING SITE, VINCE MORROW HAD MET WITH CLAYTON TREVYLLIAN AND STOCKPILING WILL BE INCLUDED IN ORIGINAL PERMIT. NEW FENCING HAS BEEN PLACED AROUND THE DIRT PILES DIRT NOT ALLOWED TO LEAVE THE PROPERTY. COMPLIANCE CLOSE CASE. | |
06/21/2018 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE AFTER RECEIVING A EMAIL FROM CLAYTON T, STATING TO MOVE FORWARD WITH THE CITAITION FOR THE STOCK PILING PERMIT. MET WITH VINCE MORROW, PROJECT MANAGER FOR THE MARK, VINCE STATED HE WOULD SEND ONE OF HIS OWN MANAGERS TO START THE PERMIT PROCESS AND AND THAT HE WAS MEETING WITH CLAYTON ON TUESDAY 6/26 DUE TO THE FIRE AT "THE MARK" | |
04/17/2018 | INSP - FOLLOW UP CODE ENFORCE | Approved | MET WITH LOREN MAKUS AT DSD TO UNDERSTAND WHETHER RICK ENGINEERING OR SOMEONE ASSOCIATED WITH TH E MARK HAD CONTACTED HIM TO SEE ABOUT SECURING A PERMIT, LOREN STATED THAT RICK DID CONTACT HIM ABOUT THE PERMIT ISSUE AND THAT RICK ENGINEERING WAS SUPPOSSE TO BE IN | |
04/12/2018 | INSP - FOLLOW UP CODE ENFORCE | Approved | VISITED SITE WHILE IN PASSING FOUND DIRT STILL ON THE PORPERTY.FOUND NO PERMITS SECURED, CONTACTED RICK ENGINEERING LEFT A MESSAGE FOR TRI MILLER PROJECT MANAGER WHO WILL GET BACK WITH ME TOMORROW CONCERNING PERMITS |