Permit: T18CM10091

Parcel: 14042077D

Inspection Status: Approved

Inspection History: FRAMING

Permit Number - T18CM10091

Inspection Description - FRAMING

Inspection Status - Approved

Date Description Inspector Results Comments
12/18/2020 FRAMING Approved Approved.
08/10/2020 FRAMING Partial Approval Partial , Framing for Elevator Shaft for all 4 levels ok to Sheetrock. Framing and lining for Mechanical shaft located @ GL 11-E all four levels ok to Proceed.
07/21/2020 FRAMING Partial Approval partial
1- Third Floor fur out is okay to sheet rock.
07/17/2020 FRAMING Partial Approval Partial, Framing 2nd floor corridor Fire stop in place ok to proceed.
06/23/2020 FRAMING Partial Approval , partial
1- This inspection is for the entire Third Floor only.
06/04/2020 FRAMING Partial Approval Partial, Electrical rooms 4 floors, Walls ok to sheet one side to surface mount Equipment.
06/01/2020 FRAMING Partial Approval partial
1- Lobby ceiling area is okay for first layer of sheet rock.,
05/22/2020 FRAMING Partial Approval Partial, 4th Floor Corridor Deck framing .
05/18/2020 FRAMING Partial Approval partial
1- Exterior Zip system sheathing and shear wall nailing is okay for all floors to tape and seal.
05/13/2020 FRAMING Partial Approval 1- 3rd Floor Corridor deck from grid line 1 to 20 is okay to cover.
05/01/2020 FRAMING Partial Approval 1- First Floor Corridor ceiling from grid line 1 thru 14 is okay for sheet rock.
2- Second Floor Corridor ceiling from grid line 1 thru 20 is okay for sheet rock.